Posting about this project makes me laugh a little because
it was the first project back in the fall that I was planning on starting in
December (which would have been included in the Man Gift to My Wife Series). I
had updated the Laundry Closet back in the fall and started drafting plans for
doing the hall closet (which is now the “linen closet”). I drew out the plans
for what I wanted to do and estimated the materials needed, but then the book
sat on my night stand until a month ago.
I had to chunk this project because I did not have the time
all in one day to complete it, so I decided to do some framing here and then do
some shelving there. Then come back and touch up a little here and finally
paint a little there.
So here are the project pictures. Enjoy them! There is still
one more shelf that I would like to add, but we are not necessarily in a rush
to put it in :)
And what's behind door #1? |
A bunch of junk that has been piling up over the last year and some change. |
Well all of that had to go for now...and then we were left with these... |
But not for long! |
Then it became time to frame out the first of the top shelves. |
And then the side shelves. |
Nailed tops on to the frames. |
Always a good time when you can play with the compressor and nail gun. |
Then after the bottoms were attached, it was necessary to caulk the gaps. |
Of course, Logan had to come by and inspect the project after I put the faces on the shelves. |
They withstood his rigorous shoving and pushing test. |
The top shelf withstood the weight test. |
They they got primed. |
Then they got a nice coat of white. |
And now we have started to put things back into the closet. It still needs the smaller higher up shelf, but that can wait until summer time. I think it's a lot nicer than what it was before! |